On this page are links, that will be updated as work progresses, of the Bayhorse underground drill program. Drilling operations are conducted by highly trained multidisciplinary teams working together supporting each other in the challenging small mine underground environment

Bayhorse US Operations Manager, Jon Farrell, CEO, Graeme O’Neill, Drill Boss, Bob Adams

IMG_6033 Taking core out IMG_6041 Drilling in Progress

Drill in operation

Due to the restricted spaces in an underground location, setting the drill rig, power pack, control panel, etc, inside the drift requires many steps

IMG_5931 Making head room for the rig

IMG_5932 Bolting the rig down

IMG_5892 Video Power pack move underground

IMG_5851 Video Drill move underground

Bayhorse Mine portal with the Pegasus property in the background

Bayhorse CEO, Graeme O’Neill, Hardrock Services LLC personnel, Nathan Iannone, Bob Adams, Jordan Iannone

Prepping the rig before moving underground

Below, Bayhorse moving company  at work

MENU